CurioSpanWholesale guidesWholesale squishy toy quote checklist: MOQ, pack-out, and freight

Buying & operations · 5 min read

Wholesale squishy toy quote checklist: MOQ, pack-out, and freight

Use this checklist when your shortlist is ready to send. It shows which fields the buyer supplies, which the supplier must confirm, and how to mark a quotation that is still incomplete. Keep an RFQ request separate from an accepted order.

Quick answer

Send one line per SKU with requested pieces, variant, destination, timing and packaging needs. Ask the supplier to return the accepted quantity, production MOQ, specification, pack-out, price basis, freight scope and open items. Reuse the trial-order CSV, compare the reply line by line, then approve the confirmed terms separately.

Request a buyer quoteBrowse products
Product factsSKU, outer material, filling, dimensions, unit weight
Pack-outDisplay box, inner pack, carton quantity, carton size, gross weight
CommercialsIndicative EXW price, production MOQ, freight mode, payment fees

Separate buyer input and supplier confirmation

A useful RFQ gives the supplier enough information to quote the same product and scope you intend to buy. CurioSpan catalog prices are indicative USD-per-piece EXW Yiwu references; freight, duties, payment fees and extra packaging are confirmed separately.

RFQ input and confirmation responsibilities
FieldBuyer suppliesSupplier confirms in the quote
ProductExact SKU/page, variant or requested mixOuter material, filling, finished size and unit weight with units
QuantityRequested pieces per SKU and color ratio if neededAccepted quantity, production/color MOQ and any required change
PackagingExisting or custom package request and display needsIncluded packaging, pieces per display/inner pack and final carton plan
DeliveryCountry, city/ZIP / postal code, requested timing and shipping preferenceAvailable shipping scope, confirmed packing inputs and estimated timing
Commercials and documentsCurrency needs, requested destination documents and approval contactPrice basis, exclusions, payment terms, quote validity and exact document availability/scope

Download the existing trial-order CSV

The small-MOQ guide explains the worksheet fields. Replace its example rows, leave supplier-confirmed fields blank until answered, and keep the quote reference with the completed file. Blank does not mean zero or accepted.

A filled request example you can adapt

Fictional buyer request, not an orderThe store, destination, date and quantities below are invented for teaching. The SKU references are catalog examples. This is not an actual customer inquiry, a supplier quote, accepted MOQ, freight offer or delivery promise.
Example RFQ — buyer input only
FieldExample request
Buyer / channelEXAMPLE STORE (fictional) · gift shop
Destination / requested shelf dateSeattle, WA 98101, United States · December 1, 2026 requested; feasibility unconfirmed
CS-VAS-02 Vaseline Cheese Cube12 pieces requested; ask which variants are available rather than assuming a color mix
CS-CR-50 Color-Changing Lemon24 pieces requested; exact available variant and pack-out to be confirmed
Total request12 + 24 = 36 pieces requested; accepted quantity and production MOQ remain open
Packaging / freightExisting packaging; confirm display boxes, final mixed-carton plan and whether a smaller-order shipping option is available
Documents / replyIdentify documents available for each exact SKU and US destination; return price basis, all exclusions, timing, payment terms and quote validity

Example inquiry note: “Please quote 12 pieces of CS-VAS-02 and 24 pieces of CS-CR-50 for the destination above. Please state any changes needed to meet production, color or packing minimums. Confirm the included packaging, final carton dimensions and gross weight before quoting transport. We have requested a shelf date; please confirm feasibility rather than treating it as an agreed delivery date.”

Check the returned quotation before treating it as complete

Use confirmed, pending or not applicable with a reason for each field. A reply containing a unit price and a catalog carton quantity is still incomplete if it does not say whether your requested quantity is accepted or how the mixed shipment will be packed.

Missing-field check for a supplier reply
If the reply says…What is still openAsk for…
“12 pieces per style”Whether that is a request point or the accepted production quantityThe accepted quantity and production/color minimum for each line
“96 pieces per carton”Whether a smaller mixed request is accepted and how it shipsThe final inner/display arrangement, carton count, dimensions and gross weight
A per-piece price onlyCurrency, EXW or delivered basis, packaging and excluded feesA dated price basis, included scope, exclusions and validity
A transit duration onlyWhen the duration starts and whether production and final delivery are includedThe start/end milestones and a current destination-specific plan
“Documents available”Exact SKU coverage and whether this is a supporting test report or another documentDocument type, product/version scope, availability and responsible reviewer

Keep the requested and confirmed values in separate columns. If the supplier changes a quantity or package, recalculate the product subtotal and packing inputs before approval. Move accepted terms into the purchase-order record; keep sample and packaging approvals in the versioned approval record.

Keep MOQ and pack quantities separate

Quote requests start from 12 pieces per style, and mixed styles are welcome. That request point is different from a supplier’s production MOQ. Ask for the accepted quantity, color minimum and packaging minimum when they differ. A display-box count or carton quantity does not independently establish production MOQ.

Keep material and filling on each line

CurioSpan lists TPR outer material with brick clay, Vaseline, flour, pectin or other fillings by series, plus PU slow-rising foam styles. Record the exact outer material and filling or “no separate filling” for the SKU; “squishy” is not a complete specification.

Ask for the actual packing arrangement

Confirm whether the line is single-SKU or assorted, pieces per display box, inner pack, carton quantity, dimensions and gross weight. Display-box support is available, but final rules are confirmed by SKU. Use the pack-out guide to separate product, retail packaging and shipping-carton measurements.

Confirm freight, payment and timing

Ask for EXW pickup, air, sea or DDP options using the confirmed carton plan and destination city or postal code. Logistics estimates normally start from 22 kg. Goods are paid before production, freight is paid before dispatch, and the payment account must be company-owned. Production is usually 1–7 days after SKU details are confirmed. Reconfirm the terms and timing for the selected order; production time is not a complete door-to-door delivery estimate.

Confirm customization and document scope

Branded stickers on existing packaging have no separate minimum order quantity. Confirm the package surface, artwork, label supply and application; the product order minimum still applies. New custom printed packaging starts from 1,500 pieces, with the final minimum depending on material, structure and printing process. New-mold product projects start from 2,000 pieces and are quoted separately after the design brief is reviewed. Confirm quantity and cost for the exact project.

Supporting test reports are currently available for eligible Crunchy / Brick Clay SKUs; ask for the exact covered SKU list. See the Compliance Guide for destination-specific documentation. A supporting test report is not the same document as a CPC. Use the test report versus CPC guide to name what is requested and keep the destination review separate from the commercial quote.

Should I compare quotes by unit price only?

No. Compare the exact SKU build, accepted quantity, pack-out, production MOQ, price basis, freight scope, payment fees and custom packaging before comparing the landed cost.

Can I send the existing trial-order CSV as an RFQ?

Yes. Replace the example rows with your selections and requested quantities, complete the destination and packaging fields, and leave confirmed fields open for the supplier’s reply. It remains a request until the terms are agreed.

Does the 36-piece teaching example mean that order is accepted?

No. It is a fictional request using catalog SKU references. The supplier must confirm the accepted quantities, production MOQ, variants, packaging, freight and timing.

What should I do if a quote field is missing?

Mark it pending and ask a specific follow-up. Do not replace a missing accepted quantity, carton plan, delivery scope or document statement with an assumption.

WhatsApp sales